Ratkaisun kuvaus
RV sequence Ominaisuudet
- RV – Measurements:030-040-050-063-075-a hundred and five-one hundred ten-one hundred thirty-a hundred and fifty
- Input Choices: with input shaft, With Sq. flange,With Enter Flange
- Input CZPT .06 to 11 kW
- RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and over one hundred ten in solid iron
- Ratios between 5 and 100
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium models are equipped full with synthetic oil and let for CZPT mounting positions, with no need to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and more than are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Choices: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/level plug,Tiny gap
Standard models can be applied to a extensive range of CZPT reduction ratios from 5 to 1000.
Warranty: One year from day of shipping and delivery.
| WORM GEARBOX | |||||
| SNW SERIES | Output CZPT Selection: | ||||
| Tyyppi | Previous Variety | Lähtömomentti | Output Shaft Dia. | 14rpm-280rpm | |
| SNW030 | RV030 | 21 Nm | φ14 | Applicable CZPT CZPT : | |
| SNW040 | RV040 | 45 Nm | φ19 | .06kW-11kW | |
| SNW050 | RV050 | 84 Nm | φ25 | Input Options1: | |
| SNW063 | RV063 | 160 Nm | φ25 | With Inline AC CZPT | |
| SNW075 | RV075 | 230 Nm | φ28 | Input Options2: | |
| SNW090 | RV090 | 410 Nm | φ35 | With Sq. flange | |
| SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
| SNW110 | RV110 | 725 Nm | φ42 | With Input Shaft | |
| SNW130 | RV130 | 1050 Nm | φ45 | Enter Options4: | |
| SNW150 | RV150 | 1550 Nm | φ50 | With Enter Flange |
Starshine CZPT
ZheJiang CZPT glow CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould enterprise, was proven in 1965. CZPT glow specializes in the total CZPT transmission solution for higher-end equipment manufacturing industries dependent on the intention of “Platform Merchandise, Software Design and style and Expert Support”.
Starshine have a sturdy complex force with over 350 employees at present, such as in excess of 30 CZPT professionals, 30 good quality inspectors, covering an region of 80000 square meters and varieties of CZPT d processing devices and screening equipments. We have a very good basis for the sector software growth and services of substantial-conclude speed reducers & variators possessing to the provincial CZPT technological innovation study heart,the lab of equipment speed reducers, and the base of contemporary R&D.
Our Staff
Hyvä laatu Hallinta
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Pakkaus
Toimitus
Ep Gear’s worm gears use proper-angle (90°) non-intersecting shafts to give an effective answer for energy transmission applications demanding substantial reduction ratios in confined spaces. When correctly used, worm gears provide the smoothest and quietest kind of transmission. Because the effectiveness of a worm generate relies upon on the direct angle and the amount of stars on the worm – considering that efficiency is always the aim, this ratio ought to be held as lower as attainable. To function appropriately, the worm and worm equipment utilised with each other have to have the exact same diameter, pitch and thread.