Çözüm Açıklaması
electricity instrument machine push injection plastic toothed straight spur gear
| Mal | Özel olarak işlenmiş enjeksiyon plastik dişliler |
| Craft Process | Plastic Injection or CNC machining,CNC milling, cnc lathe machining |
| Plastik Granüller |
UL, FDA, RoHS ve benzerleri. |
| Üstün Kalite Yönetimi | ISO9001 ve ISO14001 |
| Kalıp Malzemeleri | S316,H13,718,738,P20,H13,420SS |
| Küf Günlük yaşam | Üç yüz bin atış, 1 milyon atış veya çok daha fazlası |
| Mould Cavity | Tek boşluklu, iki boşluklu veya çok boşluklu |
| İçerik | Nylon, PA66, NYLON with 30% glass fibre, Abdominal muscles, PP,Personal computer,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,HDPE,PMMA etc. |
| Kalıp boşluğu Sertliği | altmış ila 90 HRC |
| Measurement/Shade | Gears and elements dimensions are in accordance to drawings from CZPT er, and shades are CZPT ized |
| Zemin kaplama | Polished or matte floor, portray, texture, vacuum aluminizing and can be stamped with logo and so forth. |
| Boyut Toleransı | ±0.03mm or more exact |
| Work Circulation chart | Step1: Make tooling to begin with and common need to have 2~~3 weeks. Step2: Create and verify samples. Adım 3: Seri üretim için genellikle bir hafta. |
| Numunelerin onaylanması ve kabulü | Cost-free samples transported for confirmation and transport cost compensated by CZPT ers |
| Paket anlaşma | Interior obvious plastic bag/outdoors carton/wood pallets/ or any other specific deal as per CZPT er’s needs. |
| Delivery Time | Overall normally takes 2~~6weeks |
| Ödeme İfadeleri | PAYPAL, T/T, CZPT ern CZPT |
| Ulaşım | Common FEDEX, UPS, DHL, TNT, EMS or base on customer’s need. |
Yaratılış:
1. The personnel are skilled to inspect the gears and recognize any defect in creation in time.
2. QC will check out 1pcs every single 100pcs in CNC machining, and gears will fulfill all dimension tolerances.
3. Gears will be inspected at every single stage, and gears will be inspected ahead of cargo, and all inspection data will be retained in CZPT manufacturing facility for 3 many years.
four. Our income will ship you images at each and every gears manufacturing measures, and you will know the thorough manufacturing standing, and you can observe any likelihood of mistake, for CZPT sales, QC and employees are trying to keep close view on all production.
five. You will feel us functioning extremely meticulously to assure the high quality and straightforward to work with,
6. we cherish each inquiry, each possibility to make gears and areas and cherish every single CZPT er.
KALİTE Yönetim Yöntemi:
1) Pişmemiş malzemenin incelenmesi – İç Kalite Kontrolü (IQC)
two) Examining the particulars ahead of the manufacturing line operated
3) Have total inspection and routing inspection throughout mass creation—In approach top quality handle (IPQC)
4) Üretim tamamlandıktan hemen sonra dişlilerin kontrol edilmesi (FQC)
five) Examining the gears right after they are finished—–Outgoing top quality control (OQC)
Destek:
1. Molds patterns as per CZPT ers’ gears drawing
two. Distributing molds drawings to CZPT ers to evaluation and verify ahead of mols manufacturing.
3. Delivering samples with total proportions and beauty inspection report, substance certification to CZPT ers.
four. Delivering inspection report of essential dimensions and cosmetic in batches elements.
Paketleme ve sevkiyat:
one. Gears are properly and meticulously packed in PP baggage in CTNS, strong sufficient for specific transport, air shipment or sea cargo.
2. Air shipment, sea shipment or cargo by DHL, UPS, FedEx or TNT are availabe.
3. CZPT phrases: EXW, FOB HangZhou, or CIF
4. All shippings will be cautiously organized and will attain your places CZPT and properly.
SSS
Q1: How to promise the Top quality of gears and parts?
We are ISO 9001:2008 accredited manufacturing facility and we have the integrated system for industrial components good quality control. We have IQC (incoming top quality manage),
IPQCS (in approach high quality control section), FQC (ultimate top quality management) and OQC (out-likely good quality control) to handle every method of industrial elements prodution.
S2: Dişlilerinizin ve bileşenlerinizin kazancı nedir?
Our edge is the competitive and sensible costs, CZPT supply and higher high quality. Our eployees are dependable-oriented, helpful-oriented,and dilient-oriented.
Our industrial parts goods are featured by stringent tolerance, clean end and CZPT -lifestyle efficiency.
S3: CZPT işleme ekipmanları nelerdir?
Our machining equipments consist of plasticn injection machinies, CNC milling equipment, CNC turning machines, stamping machines, hobbing machines, automated lathe equipment, tapping devices, grinding machines, chopping devices and so on.
Q4: What transport ways do you use?
Genellikle UPS, DHL veya FEDEX ile veya deniz yoluyla nakliye yapıyoruz.
5: What components can you procedure?
For plastic injection gears and components, the components are Nylon, PA66, NYLON with 30% glass fibre, Ab muscles, PP,Laptop,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,HDPE,PMMA and many others.
For metal and machining gears and parts, the resources are brass, bronze, copper, stainless steel, metal, aluminum, titanium plastic etc.
Q6: How CZPT is the Supply for Your gears and areas?
Normally , it will just take us fifteen operating times for injection or machining, and we will consider to shorten CZPT guide time.
The efficiency of a worm gear transmission relies upon to a big extent on the helix angle of the worm. Multi-threaded worms and gears with increased helix angles have verified to be 25% to fifty% much more effective than single-threaded worms. The sliding motion of the worm meshing with or meshing with the worm gear benefits in substantial friction and reduction of efficiency in comparison to other types of gears. Boost performance with hardened and floor worm switch bronze worm gears.