解决方案描述
precision transmission starter injection spur plastic toy equipment Cog Wheel
| 物品 | 定制加工注塑塑料齿轮 |
| 工艺流程 | 塑料注塑或数控加工 |
| 塑料 颗粒 |
UL、FDA、RoHS 等认证。 |
| Top quality Manage | ISO9001 和 ISO14001 |
| 模具材料 | S316、H13、718、738、P20、H13、420SS |
| Mold Existence | 300,000 shots or 1,000,000 shots or a lot more |
| 模腔 | One-cavity or two cavities or Multi-cavity |
| 内容 | Nylon, PA66, NYLON with 30% glass fibre, Abdominal muscles, PP,Computer,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,HDPE,PMMA and many others. |
| 模具型腔硬度 | 六十至九十 HRC |
| Dimension/Color | Gears and components dimensions are according to drawings from CZPT er, and colours are CZPT ized |
| Area treatment | Polished or matte area, painting, texture, vacuum aluminizing and can be stamped with brand and so on. |
| 尺寸公差 | 精度为±0.05毫米或更高 |
| Perform Circulation chart | Step1: Make tooling firstly and typical want 2~~3 weeks. Step2: Produce and affirm samples. Step3: One particular 7 days for mass manufacturing usual. |
| Samples confirmation and approval | Cost-free samples shipped for affirmation and delivery price paid out by CZPT ers |
| 套餐 | Inner obvious plastic bag/outside carton/wood pallets/ or any other particular package as for every CZPT er’s specifications. |
| Shipping Time | Overall normally takes 2~~4weeks common |
| 付款条件 | PayPal、电汇、CZPT ern CZPT |
| 送货 | Usual FEDEX, UPS, DHL, TNT, EMS or base on customer’s requirement. |
创建:
one. The personnel are trained to examine the gears and recognize any defect in production in time.
2. QC will verify 1pcs each 100pcs in CNC machining, and gears will satisfy all dimension tolerances.
three. Gears will be inspected at every step, and gears will be inspected just before shipment, and all inspection data will be retained in CZPT factory for 3 years.
4. Our sales will deliver you pictures at every single gears production actions, and you will know the in depth manufacturing position, and you can observe any chance of mistake, for CZPT product sales, QC and workers are retaining near look at on all production.
five. You will truly feel us functioning really very carefully to assure the top quality and simple to operate with,
6. we cherish every inquiry, every single prospect to make gears and components and cherish every single CZPT er.
QUALITY Manage Process:
1) Inspecting the raw substance –IQC)
two) Checking the details just before the manufacturing line operated
3) Have full inspection and routing inspection throughout mass generation—In process top quality handle (IPQC)
4) Checking the gears right after manufacturing concluded—- (FQC)
five) Checking the gears following they are concluded—–Outgoing high quality control (OQC)
Service:
one. Molds patterns as per CZPT ers’ gears drawing
2. Distributing molds drawings to CZPT ers to assessment and verify before mols creation.
three. Providing samples with total proportions and cosmetic inspection report, substance certification to CZPT ers.
4. Delivering inspection report of critical proportions and cosmetic in batches areas.
包装和货物:
1. Gears are properly and meticulously packed in PP luggage in CTNS, robust adequate for convey shipping and delivery, air cargo or sea shipment.
two. Air cargo, sea shipment or shipment by DHL, UPS, FedEx or TNT are availabe.
三、CZPT条款:EXW、FOB杭州或CIF
4. All shippings will be very carefully organized and will get to your spots CZPT and safely.
常问问题
Q1: How to assure the Top quality of gears and parts?
We are ISO 9001:2008 certified manufacturing facility and we have the built-in program for industrial components quality management. We have IQC (incoming good quality manage),
IPQCS (in approach good quality manage area), FQC (last good quality management) and OQC (out-heading quality management) to management every single method of industrial parts prodution.
Q2:你们的齿轮和组件的增益是多少?
Our advantage is the competitive and affordable prices, CZPT shipping and delivery and high top quality. Our eployees are responsible-oriented, helpful-oriented,and dilient-oriented.
Our industrial elements goods are featured by rigid tolerance, easy finish and CZPT -life efficiency.
Q3:CZPT加工设备是什么?
Our machining equipments consist of plasticn injection machinies, CNC milling machines, CNC turning devices, stamping equipment, hobbing devices, automatic lathe equipment, tapping equipment, grinding machines, cutting devices and so on.
This autumn: What transport techniques do you use?
通常情况下,我们会使用 UPS、DHL 或 FedEx 以及海运进行运输。
five: What components can you method?
For plastic injection gears and elements, the supplies are Nylon, PA66, NYLON with thirty% glass fibre, Abdominal muscles, PP,Laptop,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,HDPE,PMMA etc.
For metallic and machining gears and parts, the resources are brass, bronze, copper, stainless steel, metal, aluminum, titanium plastic and so on.
Q6: How CZPT is the Delivery for Your gears and parts?
Typically , it will just take us fifteen operating times for injection or machining, and we will try to shorten CZPT lead time.
The advised resources for the worm are hardened steel and bronze for the worm equipment. Even so, based on the application, unhardened steel worms can run sufficiently and much more economically on forged iron worm gears rated at fifty%. In addition to steel and hardened metal, worms are offered in stainless steel, aluminum, bronze, and nylon worm gears are available in steel, hardened steel, stainless steel, aluminum, nylon, and non-metallic (phenolic).