解决方案描述
OEM CZPT pinion reduction device push spur injection plastic gear
| 商品 | 定制加工注塑塑料齿轮 |
| Craft Method | 塑料注塑或数控加工 |
| 塑料 颗粒 |
UL, Food and drug administration, RoHS etc. |
| Top quality Manage | ISO9001 和 ISO14001 |
| 模具材料 | S316、H13、718、738、P20、H13、420SS |
| 霉菌日常生活 | 300,000 shots or 1,000,000 shots or a lot more |
| Mildew Cavity | 单腔、双腔或多腔 |
| 物质 | Nylon, PA66, NYLON with 30% glass fibre, Abdominal muscles, PP,Computer,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,HDPE,PMMA and many others. |
| 模具型腔硬度 | sixty to ninety H.R.C |
| Size/Colour | Gears and components dimensions are in accordance to drawings from CZPT er, and shades are CZPT ized |
| 地面处理 | Polished or matte surface area, painting, texture, vacuum aluminizing and can be stamped with brand and so on. |
| 尺寸公差 | ±0.05mm or a lot more specific |
| Operate Stream chart | Step1: Make tooling to start with and typical require 2~~3 weeks. Step2: Produce and affirm samples. Step3: One week for mass manufacturing common. |
| 样品确认和验收 | Free of charge samples transported for confirmation and transport expense paid by CZPT ers |
| 套餐 | Interior obvious plastic bag/outdoors carton/wood pallets/ or any other particular package deal as for each CZPT er’s requirements. |
| Shipping Time | Complete will take 2~~4weeks usual |
| 付款短语 | PayPal、电汇、CZPT ern CZPT |
| 运输 | Common FEDEX, UPS, DHL, TNT, EMS or base on customer’s requirement. |
一代:
1. The staff are skilled to inspect the gears and recognize any defect in creation in time.
two. QC will check out 1pcs every 100pcs in CNC machining, and gears will fulfill all dimension tolerances.
3. Gears will be inspected at each step, and gears will be inspected ahead of cargo, and all inspection records will be kept in CZPT manufacturing unit for 3 a long time.
4. Our revenue will send out you pictures at every gears creation actions, and you will know the detailed production position, and you can notice any likelihood of mistake, for CZPT sales, QC and staff are retaining near look at on all creation.
five. You will come to feel us operating very meticulously to guarantee the top quality and effortless to work with,
6. we cherish each and every inquiry, every single possibility to make gears and parts and cherish every single CZPT er.
质量管理程序:
1) Inspecting the uncooked substance –IQC)
two) Checking the specifics before the generation line operated
3) Have full inspection and routing inspection during mass generation—In method high quality control (IPQC)
4) Examining the gears right after creation concluded—- (FQC)
five) Checking the gears following they are finished—–Outgoing high quality handle (OQC)
支持:
one. Molds styles as per CZPT ers’ gears drawing
2. Submitting molds drawings to CZPT ers to overview and verify before mols manufacturing.
3. Providing samples with complete dimensions and cosmetic inspection report, materials certification to CZPT ers.
4. Providing inspection report of critical proportions and cosmetic in batches parts.
包装和运输:
one. Gears are well and very carefully packed in PP luggage in CTNS, strong sufficient for specific delivery, air cargo or sea shipment.
2. Air cargo, sea cargo or shipment by DHL, UPS, FedEx or TNT are availabe.
3. CZPT条款:EXW、FOB杭州或CIF
four. All shippings will be very carefully arranged and will attain your locations CZPT and safely.
常问问题
Q1: How to promise the High quality of gears and areas?
We are ISO 9001:2008 qualified manufacturing unit and we have the built-in program for industrial components high quality management. We have IQC (incoming high quality management),
IPQCS (in approach top quality control segment), FQC (final good quality handle) and OQC (out-heading top quality handle) to control each method of industrial parts prodution.
Q2: What are the Gain of your gears and areas?
Our gain is the competitive and reasonable prices, CZPT supply and substantial good quality. Our eployees are dependable-oriented, helpful-oriented,and dilient-oriented.
Our industrial parts products are featured by rigorous tolerance, sleek finish and CZPT -life efficiency.
Q3:CZPT加工设备是什么?
Our machining equipments contain plasticn injection machinies, CNC milling machines, CNC turning equipment, stamping devices, hobbing machines, automated lathe equipment, tapping machines, grinding machines, slicing machines and so on.
This fall: What transport ways do you use?
通常情况下,我们会使用 UPS、DHL 或 FedEx 以及海运。
five: What supplies can you process?
For plastic injection gears and parts, the resources are Nylon, PA66, NYLON with 30% glass fibre, Stomach muscles, PP,Personal computer,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,HDPE,PMMA and many others.
For metallic and machining gears and parts, the materials are brass, bronze, copper, stainless steel, metal, aluminum, titanium plastic and so forth.
Q6: How CZPT is the Shipping for Your gears and components?
Typically , it will take us fifteen operating times for injection or machining, and we will consider to shorten CZPT direct time.
Lubrication is an important factor to increase the performance of worm gear transmission. The worm equipment motion generates a good deal of warmth, which decreases performance. The power delivered at a presented temperature boosts with the transmission effectiveness. Appropriate lubrication minimizes friction and warmth, which boosts efficiency.