{"id":1026,"date":"2022-03-31T00:31:20","date_gmt":"2022-03-31T00:31:20","guid":{"rendered":"https:\/\/wormwheelgear.top\/china-factory-large-spur-girth-gear-for-ball-mill-manufacturers\/"},"modified":"2022-03-31T00:31:20","modified_gmt":"2022-03-31T00:31:20","slug":"china-factory-large-spur-girth-gear-for-ball-mill-manufacturers","status":"publish","type":"post","link":"https:\/\/wormwheelgear.top\/bs\/china-factory-large-spur-girth-gear-for-ball-mill-manufacturers\/","title":{"rendered":"Kineska tvornica Veliki zup\u010danici s cilindri\u010dnim vijencem za proizvo\u0111a\u010de kugli\u010dnih mlinova"},"content":{"rendered":"<p>\n<h2>Opis stavke<\/h2>\n<p>\n<p><p>CITICIC is the casting &amp; forging centre in central-south CZPT , possessing 50t electrical arc furnace, 60t LF ladle refining furnace, and 60t VD\/VOD refining furnace, and so on. We can pour 350t liquid steel one time and yields much more than 200,000t of higher quality liquid steel and can produce the substantial high quality steel of much more than 260 metal grades these kinds of as carbon metal, structural alloy metal and the structural steel, refractory steel and stainless steel of unique prerequisite. The maximum fat of casting, grey casting, graphite forged iron and CZPT -ferrous casting is 200t, 30t, 20t and 205t independently.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Atributi:<\/strong><\/p>\n<p>Module Assortment: ten Module to 70 Module.<\/p>\n<p>Pre\u010dnik: Min 800 mm do 16000 mm.<\/p>\n<p>Weight: CZPT  120 MT solitary piece.<\/p>\n<p>A few different designs: Fabricated metal &#8211; cast ring &#8211; rolled plate<\/p>\n<p>Requirements \/ Certificates: \u2022 UNI EN ISO \u2022 AWS \u2022 ASTM \u2022 ASME \u2022 DIN<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><strong>Nagrade:<\/strong><\/p>\n<p>&#8211; Merchandise with CZPT ers&#8217; Types<\/p>\n<p>&#8211; CZPT  Machining &amp; Heat Treatment method Abilities<\/p>\n<p>&#8211; Stringent Top quality Handle<\/p>\n<p>\u2013 Brza dostava i slanje<\/p>\n<p>&#8211; Expertise in Cooperation with CZPT  five hundred Businesses<\/p>\n<p>\u00a0<\/p>\n<p><strong>Proces:<\/strong><\/p>\n<p>Kovanje \/ CZPT <\/p>\n<p>Normaliziraju\u0107a i otpu\u0161taju\u0107a obrada<\/p>\n<p>Kaljenje i otpu\u0161tanje<\/p>\n<p>End Machining (Tooth Grinding)<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>We can supply you in CZPT  process situations remedies for A lot of Finish Markets and Programs<\/p>\n<p>\u2013Rudarstvo<\/p>\n<p>\u2013Metalurgija<\/p>\n<p>&#8211;Energy Generation<\/p>\n<p>\u2013\u0160e\u0107er<\/p>\n<p>\u2013Cementara<\/p>\n<p>\u2013Luka CZPT ry<\/p>\n<p>&#8211;Oil and organic<\/p>\n<p>\u2013Proizvodnja papira<\/p>\n<p>&#8211;OEM gear situation<\/p>\n<p>&#8211;Basic CZPT <\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><strong>Requirements Of Gear:<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td>Ne.<\/td>\n<td>\n<p>Roba<\/p>\n<\/td>\n<td>\n<p>Opis<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>1<\/p>\n<\/td>\n<td>\n<p>Pre\u010dnik<\/p>\n<\/td>\n<td>\n<p>\u226415 m<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>dva<\/p>\n<\/td>\n<td>\n<p>Modul<\/p>\n<\/td>\n<td>\n<p>\u226445<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>tri<\/p>\n<\/td>\n<td>\n<p>Sadr\u017eaj<\/p>\n<\/td>\n<td>\n<p>Cast Alloy Steel, Solid Carbon Steel, Cast Alloy Metal, Cast Carbon Steel<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>4<\/p>\n<\/td>\n<td>\n<p>Okvir od<\/p>\n<\/td>\n<td>\n<p>Built-in, 50 percent to Half, Four Parts and Far more Items<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>Terapija toplinom<\/p>\n<\/td>\n<td>\n<p>Kaljenje i otpu\u0161tanje, Normalizacija i otpu\u0161tanje, Cementacija i kaljenje i otpu\u0161tanje<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>6<\/p>\n<\/td>\n<td>\n<p>Tooth Sort<\/p>\n<\/td>\n<td>\n<p>Annular Gear, Outer Gear Ring<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>7<\/p>\n<\/td>\n<td>\n<p>Uobi\u010dajeno<\/p>\n<\/td>\n<td>\n<p>ISO, EN, DIN, AISI, ASTM, JIS, IS, GB<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><p>\u00a0<\/p>\n<p><strong>Inspection And Examination Define Of Girth Gear:<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td>Ne.<\/td>\n<td>\n<p>Stavka<\/p>\n<\/td>\n<td>\n<p>Inspection Area<\/p>\n<\/td>\n<td>\n<p>Uslovi za prihvatanje<\/p>\n<\/td>\n<td>\n<p>Faza inspekcije<\/p>\n<\/td>\n<td>\n<p>Certifikati<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>1<\/p>\n<\/td>\n<td>\n<p>Hemijsko\u00a0<br \/>Sastav<\/p>\n<\/td>\n<td>\n<p>Uzorak<\/p>\n<\/td>\n<td>\n<p>Material Prerequisite<\/p>\n<\/td>\n<td>\n<p>Prilikom topljenja<br \/>After Heat Remedy<\/p>\n<\/td>\n<td>\n<p>Hemijski sastav\u00a0<br \/>Prijavi<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>dva<\/p>\n<\/td>\n<td>\n<p>Mehani\u010dki<br \/>Nekretnine<\/p>\n<\/td>\n<td>\n<p>Sample (Take a look at Bar on the Gear Physique)<\/p>\n<\/td>\n<td>\n<p>Technological Requirement<\/p>\n<\/td>\n<td>\n<p>Following Heat Therapy<\/p>\n<\/td>\n<td>\n<p>Mehani\u010dka svojstva\u00a0<br \/>Prijavi<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>3<\/p>\n<\/td>\n<td>\n<p>Vru\u0107ina\u00a0<br \/>Metoda lije\u010denja<\/p>\n<\/td>\n<td>\n<p>Entire Human body<\/p>\n<\/td>\n<td>\n<p>Production Normal<\/p>\n<\/td>\n<td>\n<p>For the duration of Warmth Therapy<\/p>\n<\/td>\n<td>\n<p>Izvje\u0161taj o toplotnoj terapiji<br \/>Krive toplote\u00a0<br \/>Lijek<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\u010detiri<\/p>\n<\/td>\n<td>\n<p>Tvrdo\u0107a\u00a0<br \/>Ispit<\/p>\n<\/td>\n<td>\n<p>Tooth Area, 3 Details For every 90\u00b0<\/p>\n<\/td>\n<td>\n<p>Tehnolo\u0161ka nu\u017enost<\/p>\n<\/td>\n<td>\n<p>Soon after Warmth Treatment<\/p>\n<\/td>\n<td>\n<p>Izvje\u0161taj o tvrdo\u0107i sisa\u010da<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>After Semi Finish\u00a0<br \/>Ma\u0161inska obrada<\/p>\n<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>Dimenzija\u00a0<br \/>Inspekcija<\/p>\n<\/td>\n<td>\n<p>Whole Entire body<\/p>\n<\/td>\n<td>\n<p>Crtanje<\/p>\n<\/td>\n<td>\n<p>Following Semi Finish<\/p>\n<p>Ma\u0161inska obrada<\/p>\n<\/td>\n<td>\n<p>Inspekcija dimenzija\u00a0<br \/>Prijavi<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Kompletna ma\u0161inska obrada<\/p>\n<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>6<\/p>\n<\/td>\n<td>\n<p>Magnetic CZPT  Test (MT)<\/p>\n<\/td>\n<td>\n<p>Podru\u010dje zuba<\/p>\n<\/td>\n<td>\n<p>Dogovoreni zajedni\u010dki<\/p>\n<\/td>\n<td>\n<p>Right after Complete Gear\u00a0<br \/>Zobljenje<\/p>\n<\/td>\n<td>\n<p>MT izvje\u0161taj<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>sedam<\/p>\n<\/td>\n<td>\n<p>UT<\/p>\n<\/td>\n<td>\n<p>Spokes Areas<\/p>\n<\/td>\n<td>\n<p>Agreed Normal<\/p>\n<\/td>\n<td>\n<p>After Rough Machining<\/p>\n<\/td>\n<td>\n<p>Izvje\u0161taj UT-a<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>After Welded<\/p>\n<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Ubrzo nakon polufini\u0161a\u00a0<br \/>Ma\u0161inska obrada<\/p>\n<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>osam<\/p>\n<\/td>\n<td>\n<p>PT<\/p>\n<\/td>\n<td>\n<p>Defect Spot<\/p>\n<\/td>\n<td>\n<p>Nije nazna\u010den nedostatak<\/p>\n<\/td>\n<td>\n<p>After CZPT <br \/>After Welded<\/p>\n<\/td>\n<td>\n<p>PT CZPT put<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>devet<\/p>\n<\/td>\n<td>\n<p>Inspekcija oznaka<\/p>\n<\/td>\n<td>\n<p>Entire Entire body<\/p>\n<\/td>\n<td>\n<p>Producing Normal<\/p>\n<\/td>\n<td>\n<p>Final Inspection<\/p>\n<\/td>\n<td>\n<p>Slike<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>deset<\/p>\n<\/td>\n<td>\n<p>Physical appearance Inspection<\/p>\n<\/td>\n<td>\n<p>Whole Body<\/p>\n<\/td>\n<td>\n<p>CIC&#8217;s Need<\/p>\n<\/td>\n<td>\n<p>Just before Packing (Last Inspection)<\/p>\n<\/td>\n<td>\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\n<p>jedanaest<\/p>\n<\/td>\n<td>\n<p>Otporno na hr\u0111u\u00a0<br \/>Inspekcija<\/p>\n<\/td>\n<td>\n<p>Complete Body<\/p>\n<\/td>\n<td>\n<p>Dogovoreno sredstvo protiv hr\u0111e<\/p>\n<\/td>\n<td>\n<p>Just before Packing<\/p>\n<\/td>\n<td>\n<p>Fotografije<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>12<\/p>\n<\/td>\n<td>\n<p>Pakovanje\u00a0<br \/>Inspekcija<\/p>\n<\/td>\n<td>\n<p>Cijelo tijelo<\/p>\n<\/td>\n<td>\n<p>Agreed Packing Sort<\/p>\n<\/td>\n<td>\n<p>Throughout Packing<\/p>\n<\/td>\n<td>\n<p>Fotografije<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><p>\u00a0<\/p>\n<p><strong>Amenities For CZPT  Equipment Ring:<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td>Ne<\/td>\n<td>\n<p>Roba<\/p>\n<\/td>\n<td>\n<p>Opis<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>jedan<\/p>\n<\/td>\n<td>\n<p>Sposobnost topljenja i CZPT-a<\/p>\n<\/td>\n<td>\n<p>40t, 50t, 80t serije AC CZPT elektri\u010dni luk CZPT <br \/>2\u00d7150t, 60t LF rafiniranje u loncu CZPT <br \/>150t, 60t Sequence VD \/ VOD CZPT <br \/>Veliki objekat za izlivanje dimenzija 20\u00d718m<\/p>\n<p>We can pour 900t refining liquid metal one particular time, and attain vacuum poured 600t metal ingots.<\/p>\n<p>We can generate the substantial high quality steel of more than 260 metal grades as carbon steel, structural alloy metal and the structural metal, refractory metal and stainless steel of particular necessity.\u00a0<\/p>\n<p>The maximum excess weight of casting metal, gray casting, graphite forged iron and CZPT -ferrous casting is 600t, 200t, 150t and 20t separately.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>2<\/p>\n<\/td>\n<td>\n<p>Kapacitet kovanja<\/p>\n<\/td>\n<td>\n<p>The only 1 in the word, the most technologically CZPT d and the largest\u00a0<br \/>specification18500t Oil Push, outfitted with 750t.m forging operation device<br \/>8400t Drinking water Push<br \/>3150t Drinking water Push<br \/>1600t Drinking water Push<br \/>\u03a65m CZPT CZPT prstenasti mlin (Njema\u010dka)<br \/>\u03a612m CZPT CZPT prstenasti mlin<br \/>We can roll rings of distinct sections of carbon metal, alloy metal, higher temperature alloy metal and CZPT -ferrous alloys these kinds of as copper alloy, aluminum alloy and titanium alloy.\u00a0<br \/>Maksimalni pre\u010dnik valjanog prstena bit \u0107e 12 m.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>3<\/p>\n<\/td>\n<td>\n<p>Warmth Treatment Ability<\/p>\n<\/td>\n<td>\n<p>9\u00d79\u00d715m, 8\u00d78\u00d712m, 6\u00d76\u00d715m, 15\u00d716\u00d76.5m, 16\u00d720\u00d76m, 7\u00d77\u00d717m Collection Heat CZPT  and Heat Treatment CZPT s<\/p>\n<p>\u03c62.0\u00d730m, \u03c63.0\u00d75.0m Sequence Warmth Treatment CZPT s<br \/>\u03c65.0\u00d72.5m, \u03c63.2\u00d71.5m, \u03c63.0\u00d75.0m, \u03c62.0\u00d75m Sequence Carburizing CZPT s &amp;<br \/>Nitriranje CZPT-a i kupke za kaljenje<br \/>\u03c62.0\u00d730m Effectively Sort CNC CZPT ctrical CZPT s<br \/>\u03a63.0\u00d75.0M Horizontal Gas Temperature-differential CZPT <br \/>Double-frequency and Double-position Quenching Lathe of Pinion Shaft<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>\u010detiri<\/p>\n<\/td>\n<td>\n<p>Mogu\u0107nost ma\u0161inske obrade<\/p>\n<\/td>\n<td>\n<p>1. \u22655m CNC CZPT  Duty Vertical Lathes<\/p>\n<p>12m CNC vertikalni strug sa dva stuba<br \/>10m CNC vertikalni strug sa dva stuba<br \/>10m CNC vertikalni strug s jednom kolonom<br \/>Vertikalni strug CZPT Duty od \u0161est,3 m<br \/>5m CNC CZPT  Duty Vertical Lathe<\/p>\n<p>\u00a0<\/p>\n<p>two. \u22655m Vertical Gear Hobbing CZPT s<br \/>15m CNC vertikalna oprema za glodanje CZPT <br \/>Oprema za glodanje od 10 m CZPT <br \/>8m Equipment Hobbing CZPT <br \/>5m Equipment Hobbing CZPT <br \/>3m Oprema za obradu glodanjem<\/p>\n<p>\u00a0<\/p>\n<p>tri. CZPT ed CZPT - precizna oprema za bru\u0161enje CZPT s<br \/>.8m~3.5m CNC Molding Equipment Grinding CZPT s<\/p>\n<p>\u00a0<\/p>\n<p>four. Huge CZPT ng &amp; Milling CZPT s<br \/>220 CNC Floor-mounted CZPT ng &amp; Milling CZPT <br \/>two hundred CNC Ground-mounted CZPT ng &amp; Milling CZPT <br \/>a hundred and sixty CNC Floor-mounted CZPT ng &amp; Milling CZPT <\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><p>\u00a0<\/p>\n<p>\n<p>\n<p>As the most compact modest precision equipment method, worm equipment sets supply higher reduction ratios in a quite little room. Worm equipment sets transmit movement amongst disjoint proper-angle shafts and offer the quietest, smoothest operating operation of any equipment type.<br \/><img decoding=\"async\" src=\"https:\/\/img.hzpt.com\/uploads\/images\/mechanical\/SpurGear.jpg\" alt=\"Kineska tvornica Veliki zup\u010danici s cilindri\u010dnim vijencem za proizvo\u0111a\u010de kugli\u010dnih mlinova\" title=\"\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Item Description CITICIC is the casting &amp; forging centre in central-south CZPT , possessing 50t electrical arc furnace, 60t LF ladle refining furnace, and 60t VD\/VOD refining furnace, and so on. We can pour 350t liquid steel one time and yields much more than 200,000t of higher quality liquid steel and can produce the substantial [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[7,2879,2783,2019],"class_list":["post-1026","post","type-post","status-publish","format-standard","hentry","category-product-catalog","tag-gear","tag-girth-gear","tag-large-gear","tag-spur-gear"],"_links":{"self":[{"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/posts\/1026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/comments?post=1026"}],"version-history":[{"count":0,"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/posts\/1026\/revisions"}],"wp:attachment":[{"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/media?parent=1026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/categories?post=1026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wormwheelgear.top\/bs\/wp-json\/wp\/v2\/tags?post=1026"}],"curies":[{"name":"radni list","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}